KIRKA WASTE DAM ILLUMINATION AND PROTECTION CONSTRUCTION WORK
Start Date: 29.07.2020
Client
Client Name
Finish Date: 08.02.2021
Eskişehir // Kırka
SF, USA
Share
Within the scope of the construction work, it was aimed to protect the New Waste Pond located in the ETİ Kırka Boron Operation Directorate activity area and for this purpose the following productions were made.
Manufacturing and installation of approximately 8 km long wire fence
Manufacturing, installation and commissioning of 132 lighting poles