KIRKA WASTE DAM ILLUMINATION AND PROTECTION CONSTRUCTION WORK

Start Date: 29.07.2020

Client

Client Name

Finish Date: 08.02.2021

Eskişehir // Kırka

SF, USA

Share

Within the scope of the construction work, it was aimed to protect the New Waste Pond located in the ETİ Kırka Boron Operation Directorate activity area and for this purpose the following productions were made.

  • Manufacturing and installation of approximately 8 km long wire fence

  • Manufacturing, installation and commissioning of 132 lighting poles