KIRKA V. BORAX PENTAHIDRATE PLANT
Employer: ETİ MINING ENTERPRISES GENERAL MANAGEMENT
Date of Construction: 2011-2016
Eskişehir / Kırka
Within the scope of the project, 500,000 Tons / Year capacity Borax PentaHydrate Plant; process design, basic and detailed engineering services, machinery equipment, instrumentation control devices, supply, construction, assembly, commissioning, performance tests and delivery in working condition were carried out.

L'IST İSTİNYE KONUTLARI

L'IST İSTİNYE KONUTLARI

L'IST İSTİNYE KONUTLARI

L'IST İSTİNYE KONUTLARI
1/7
L'IST ISTİNYE RESIDENCE
Employer : Bref İstinye Estate Yatırım(KREA)
Date of Construction: 2009-2010
Türkiye / İstanbul
Within the scope of the project, all construction works for the high-class residence built on a total construction area of 56,065 m² were completed.

SİLİVRİ CLUSTER PROJECT
Employer : KİPTAŞ
Date of Construction: 2007-2009
Türkiye / İstanbul
Within the scope of the project, 600-flat housing construction was carried out and the total construction area is 49,000 m2.

CITYPARK MALL SHOPPING CENTER
Employer: Citypark Project S.R.L.
Date of Construction: 2006-2008
Romania / Constanta
Within the scope of the project, the construction of Citypark Mall shopping center and landscaping was completed and the total construction area is 58,442 m2.

HADIMKÖY CLUSTER PROJECT
Employer : TOKİ
Date of Construction: 2005-2007
Türkiye / İstanbul
Within the scope of the project, 904 houses with a construction area of approximately 107,000 m², intra-island infrastructure and environmental arrangements were made.

ASELSAN PRODUCTION HALL
Employer : ASELSAN
Date of Construction: 2004-2005
Türkiye / Ankara
Within the scope of the project, the ASELSAN Production Hall was built and the total construction area is 30,180 m2.

GAZPROM HOTEL AND HEALTH CENTER
Employer : Gasprom
Y
Date of Construction: 1994-1997
Russia
Within the scope of the project, a 300-bed hotel and health center, sports and beach facilities, indoor and outdoor pools, 6 villas, and off-site and on-site infrastructure construction were carried out.