KIRKA SOLID WASTE TRANSMISSION SYSTEM CONSTRUCTION WORK
Start Date: 30.05.2019
Client
Client Name
Finish Date: 12.07.2021
Eskişehir // Kırka
SF, USA
Share
Within the scope of the construction work, it was aimed to transfer the clay wastes from the factories belonging to ETİ Kırka Boron Operations Directorate to the new waste pond with the help of a conveyor belt and the following manufacturing was carried out for this purpose.
Manufacturing, assembly and commissioning of 2.5 km long conveyor belt
Completing all electrical and automation works and coupling them to the existing control system.
3500 tons of Structural Steel Manufacturing
All Reinforced Concrete Fabrications